Aqua Strategies came to LGM for a Water Planning model of Millers Creek Reservoir. The main goal was to assist in client communication, so the map needed to be colorized. There is an existing dam structure on site that needed to be considered for any future planning, so accuracy was important.
With such an expansive and complex development plan in place, Post Brothers wanted a way to visualize the site’s height, depth, and common core areas. The commercial and residential development needed to fit within the confines of their existing sales center. A context model with surrounding buildings would be an excellent way to validate Piazza Terminals extensive design.
The relationship between architecture and topography on this bay-facing residence was incredibly important. Beyond the complex grade changes, the client wanted to better visualize the ratio of glazing to exterior walls with a physical 3D representation of the residential property.