by Casey Nero | Dec 7, 2023
Hart Howerton commissioned a model built in phases that accurately represented the complexity between topography and structure. With multiple residential architecture, engineering, and landscape design firms included in the Yuerba Buena Island Project, it was crucial to show how each phase integrated into a seamless architectural vision.
by David Ellis | Jun 6, 2023
Grundfos needed a better way to present their water management pump designs. Real world pumps ranged in size and weight, and were too cumbersome to bring to and from meetings. They approached us to develop a lightweight, scaled sales sets of their proprietary designs.
by David Ellis | Jun 22, 2023
This concept model was used in internal construciton and engineering meetings. 3D printing is a cost effective way to produce iterative design study models.
by David Ellis | Jun 16, 2023
With initial architectural plans in place, The Tahoe Regional Arts Foundation needed a portable display of their Stages at Northstar facility to accompany them in their Capital Campaign and community connection efforts. With multiple donor events to visit across California and Nevada, the model needed to showcase the amenities of the property while being travel efficient.
by David Ellis | Jun 7, 2023
Aqua Strategies came to LGM for a Water Planning model of Millers Creek Reservoir. The main goal was to assist in client communication, so the map needed to be colorized. There is an existing dam structure on site that needed to be considered for any future planning, so accuracy was important.